Construction Page 3
Home Up

 

Home

What's Happening

What's New
Enter Our Contest
Join Mailing List
Contest Winners
Food Stuff
How To Find Us
Party Special
 
 
Photos
Fun At Jammers
Jammers Crew
Construction
Bud Events
Miller Events
New Years Eve 2004
New Years Eve 2003
Parrot Head
Bar Stool Races
Golf Outing's
 
 
Joke Zone
PG-Rated Jokes
Text Zone
R-Rated Jokes
R-Rated Animated
X-Rated Jokes
Computer Jokes
Sound Zone
Video Zone
Game Zone
 
 
Other
Meet The Owners
Cool Links
Search Engines
 
 
 

 

Jammers 
Under
Construction
Page 3

Each of the thumbnails below is linked to the larger version of the picture. To view the larger version just click on the thumbnail. To return to this page click on your back button.

Between 2002 & 2004 we just worked on a bunch of random repairs and small changes including the middle room ceiling, more insulation, siding resealing, deck resealing, and all the fun general repairs as needed to keep the bar rolling along.  Real exciting stuff
img_0751.jpg (76012 bytes)
The cooler we bought
img_0756.jpg (27937 bytes)
Ready for concrete
2005 brought on a new project a walk in cooler.  Our current walk in cooler was completely shot, the walls were rotted out and it was to small.  We bought a walk in cooler from a local store that was closed, added a new addition onto the bar, installed the cooler, cut holes in the wall to allow us to remove the stand up glass coolers.  We also installed a new back bar and sidewalks to allow our distributors to easily roll the beer in from the outside without going through the bar.  In 2006 we will complete the cooler by adding a chilled beer tap line system, finishing the back bar wall and removing the rest of our old systems.  The changes allowed us to go from 5 compressors to 1 and will eliminate the shuffling of beer kegs.
img_0757.jpg (91186 bytes)
Pouring the mud
img_0759.jpg (80886 bytes)
Start of the walls
img_0763.jpg (84980 bytes)
Framing almost done
img_0761.jpg (84283 bytes)
Framing the roof
img_0775.jpg (71815 bytes)
Cooler install begins
img_0808.jpg (74643 bytes)
Doing the
Soffit
img_0784.jpg (84036 bytes)
Sidewalk start
img_0786.jpg (98883 bytes)
Sidewalk pour
Check back soon for remodeling updates on our progress...
Back to Page 2
We sincerely thank all of the folks that have helped with the remodeling of Jammers!!  We couldn't have done it without you!!
Last Updated: 01/02/2006 Visitors: Hit Counter